Industrial support
Industrial Cleaning
Plant, warehouse and production-area cleaning under permit-to-work controls.
- Specified tasks
- 5
- Contracted KPIs
- 4
- Risk controls
- 4
- Reporting
- Monthly
Overview
Industrial cleaning is planned around production schedules, shutdowns and permit-to-work systems. Every task has a method statement, a risk assessment and a named competent supervisor.
We operate within the client's HSE management system and report safety performance alongside service performance.
Scope of service
Typical inclusions. Final scope is confirmed in the service specification after site survey.
Production areas
- Production-line and machinery cleaning
- Food-safe hygiene cleaning
- Spill response
- Clean-room support
Warehousing & logistics
- Racking and high-level cleaning
- Floor scrubbing and line-marking care
- Loading bays and yards
- Dock levellers and pits
Specialist
- Confined-space cleaning
- Tank and silo cleaning
- Shutdown and turnaround support
- Industrial waste removal
Specification
Extract from a standard specification. Frequencies and standards are set per area and risk rating for each contract.
| Task | Frequency | Standard |
|---|---|---|
| Production-area hygiene clean | FrequencyPer shift changeover | StandardClient hygiene standard, ATP-verified where required |
| Warehouse floor scrub | FrequencyDaily / weekly by zone | StandardFree of debris, fluids and dust build-up |
| High-level and racking clean | FrequencyQuarterly | StandardUnder permit, MEWP-certified operatives |
| Confined-space entry clean | FrequencyScheduled shutdown | StandardPermit, gas monitoring, rescue plan |
| Spill response | FrequencyOn call | StandardContained within 30 minutes |
Performance & KPIs
Default targets. Contracted KPIs, measurement methods and any service credits are agreed before mobilisation.
| KPI | Target | Measured by | Reported |
|---|---|---|---|
| Lost-time injury frequency rate | Target< 0.3 | Measured byHSE incident records | ReportedMonthly |
| Permit compliance | Target100% | Measured byPermit audit | ReportedMonthly |
| Hygiene audit score | Target≥ 95% | Measured byClient / ATP audit | ReportedMonthly |
| Shutdown tasks completed in window | Target100% | Measured byShutdown plan close-out | ReportedPer shutdown |
Risk management
Principal operational risks for this service and the controls applied on every contract.
| Risk | Control |
|---|---|
| Work at height | ControlMEWP-certified operatives, rescue plans, permit-to-work |
| Confined-space entry | ControlTrained entry teams, gas monitoring, standby rescue |
| Moving machinery | ControlLock-out/tag-out with client engineering before any task |
| Product contamination | ControlFood-safe chemicals, colour-coding and ATP verification |
Reporting
- Monthly HSE statistics
- Permit and method statement register
- Hygiene audit results
- Shutdown close-out reports
| Cadence | Output |
|---|---|
| Daily | OutputTask completion and attendance, available in the client portal |
| Weekly | OutputExceptions, reactive requests and open actions |
| Monthly | OutputKPI performance report, audit results, HSE statistics, corrective actions |
| Quarterly | OutputContract review: trends, innovation proposals, cost and consumption |
| Annually | OutputContract performance review, ESG data and specification refresh |
Mobilisation
Every contract follows the same dated mobilisation plan, closed out with a report at Day 90.
Weeks −6 to −4
Contract award & due diligence
- Mobilisation lead and contract manager appointed
- TUPE / incumbent workforce data requested and reviewed
- Site surveys and asset verification
Weeks −4 to −2
Specification & systems
- Task schedules and frequencies agreed per area
- Risk assessments, method statements and COSHH register issued
- CAFM, helpdesk and reporting configured to the KPI schedule
Weeks −2 to 0
People & equipment
- Vetting, induction and site-specific training completed
- Equipment, consumables and uniforms delivered and inspected
- Client stakeholder and escalation matrix confirmed
Day 1 to Day 90
Service commencement & stabilisation
- Daily supervisor walk-rounds and weekly client reviews
- Baseline audits completed in the first 30 days
- Mobilisation close-out report issued at Day 90
Additional for this service
- Integration with the client permit-to-work system before Day 1
- Site-specific HSE induction for all personnel
Contract evidence
Procurement questions
Can you work within our permit-to-work system?
Yes. Our supervisors are trained as permit receivers and we adopt your system rather than running a parallel one.
Do you support shutdowns?
Yes, with scalable shutdown crews planned against your turnaround schedule and closed out with a written report.
Included in every contract
- Named contract manager
- 24/7 service desk
- Independent quality audits
- Monthly KPI report
- Site-specific risk assessments
- Vetted, trained personnel
Request a proposal for industrial cleaning.
Share your sites, scope and timelines. We will arrange a site survey and return a specification, staffing model and price.