Skip to content
Cleanora

Maintenance

Planned Preventive Maintenance

PPM schedules and statutory testing across MEP, HVAC and building fabric.

Specified tasks
5
Contracted KPIs
4
Risk controls
4
Reporting
Monthly

Overview

Planned preventive maintenance keeps assets safe, compliant and available. Task lists are aligned to SFG20 and manufacturer requirements and scheduled through CAFM against a verified asset register.

Statutory and mandatory testing is tracked in a compliance register so that certificate status is visible at any time.

Scope of service

Typical inclusions. Final scope is confirmed in the service specification after site survey.

Mechanical

  • HVAC and chillers
  • Pumps and plant rooms
  • Water hygiene (Legionella control)
  • Gas and boiler plant

Electrical

  • LV distribution
  • Emergency lighting
  • Generators and UPS
  • Fixed-wire and portable appliance testing

Building fabric & life safety

  • Fire alarm and detection
  • Fire doors and dampers
  • Roofs, gutters and drainage
  • Doors, locks and access systems

Specification

Extract from a standard specification. Frequencies and standards are set per area and risk rating for each contract.

Service specification
HVAC service and filter changeFrequencyQuarterlyStandardSFG20 / OEM schedule
Emergency lighting testFrequencyMonthly flick / annual 3-hrStandardCertificate issued
Water hygiene monitoringFrequencyMonthly temperaturesStandardPer water safety plan
Fire alarm serviceFrequency6-monthlyStandardApplicable national fire standard
Generator load testFrequencyMonthly / annualStandardLogged with run hours

Performance & KPIs

Default targets. Contracted KPIs, measurement methods and any service credits are agreed before mobilisation.

Key performance indicators
PPM completion in periodTarget≥ 98%Measured byCAFM work ordersReportedMonthly
Statutory complianceTarget100%Measured byCertificate registerReportedMonthly
Critical asset availabilityTarget≥ 99.5%Measured byDowntime recordsReportedMonthly
First-time fix rateTarget≥ 85%Measured byCAFM close-outReportedMonthly

Risk management

Principal operational risks for this service and the controls applied on every contract.

Risks and controls
Expired statutory certificationControlCompliance register with 60-day expiry alerts
LegionellaControlWater safety plan, monitoring and remedial action tracking
Critical plant failureControlCriticality-ranked PPM and spares holding for critical assets
Unsafe isolationControlPermit-to-work, lock-out/tag-out, competent persons register

Reporting

  • PPM completion and backlog
  • Statutory certificate register
  • Asset condition and remedial works
  • Lifecycle forecast (annual)
Reporting cadence
DailyOutputTask completion and attendance, available in the client portal
WeeklyOutputExceptions, reactive requests and open actions
MonthlyOutputKPI performance report, audit results, HSE statistics, corrective actions
QuarterlyOutputContract review: trends, innovation proposals, cost and consumption
AnnuallyOutputContract performance review, ESG data and specification refresh

Mobilisation

Every contract follows the same dated mobilisation plan, closed out with a report at Day 90.

  1. Weeks −6 to −4

    Contract award & due diligence

    • Mobilisation lead and contract manager appointed
    • TUPE / incumbent workforce data requested and reviewed
    • Site surveys and asset verification
  2. Weeks −4 to −2

    Specification & systems

    • Task schedules and frequencies agreed per area
    • Risk assessments, method statements and COSHH register issued
    • CAFM, helpdesk and reporting configured to the KPI schedule
  3. Weeks −2 to 0

    People & equipment

    • Vetting, induction and site-specific training completed
    • Equipment, consumables and uniforms delivered and inspected
    • Client stakeholder and escalation matrix confirmed
  4. Day 1 to Day 90

    Service commencement & stabilisation

    • Daily supervisor walk-rounds and weekly client reviews
    • Baseline audits completed in the first 30 days
    • Mobilisation close-out report issued at Day 90

Additional for this service

  • Asset register verification and criticality ranking
  • Transfer of statutory certificates and logbooks

Contract evidence

Procurement questions

Do you verify the asset register?

Yes. We survey and tag assets in the first 60 days and report discrepancies before PPM pricing is finalised.

Who holds the certificates?

Certificates are stored in CAFM and remain the client's records. They transfer with the contract.

Included in every contract

  • Named contract manager
  • 24/7 service desk
  • Independent quality audits
  • Monthly KPI report
  • Site-specific risk assessments
  • Vetted, trained personnel

Request a proposal for planned preventive maintenance.

Share your sites, scope and timelines. We will arrange a site survey and return a specification, staffing model and price.