Maintenance
Planned Preventive Maintenance
PPM schedules and statutory testing across MEP, HVAC and building fabric.
- Specified tasks
- 5
- Contracted KPIs
- 4
- Risk controls
- 4
- Reporting
- Monthly
Overview
Planned preventive maintenance keeps assets safe, compliant and available. Task lists are aligned to SFG20 and manufacturer requirements and scheduled through CAFM against a verified asset register.
Statutory and mandatory testing is tracked in a compliance register so that certificate status is visible at any time.
Scope of service
Typical inclusions. Final scope is confirmed in the service specification after site survey.
Mechanical
- HVAC and chillers
- Pumps and plant rooms
- Water hygiene (Legionella control)
- Gas and boiler plant
Electrical
- LV distribution
- Emergency lighting
- Generators and UPS
- Fixed-wire and portable appliance testing
Building fabric & life safety
- Fire alarm and detection
- Fire doors and dampers
- Roofs, gutters and drainage
- Doors, locks and access systems
Specification
Extract from a standard specification. Frequencies and standards are set per area and risk rating for each contract.
| Task | Frequency | Standard |
|---|---|---|
| HVAC service and filter change | FrequencyQuarterly | StandardSFG20 / OEM schedule |
| Emergency lighting test | FrequencyMonthly flick / annual 3-hr | StandardCertificate issued |
| Water hygiene monitoring | FrequencyMonthly temperatures | StandardPer water safety plan |
| Fire alarm service | Frequency6-monthly | StandardApplicable national fire standard |
| Generator load test | FrequencyMonthly / annual | StandardLogged with run hours |
Performance & KPIs
Default targets. Contracted KPIs, measurement methods and any service credits are agreed before mobilisation.
| KPI | Target | Measured by | Reported |
|---|---|---|---|
| PPM completion in period | Target≥ 98% | Measured byCAFM work orders | ReportedMonthly |
| Statutory compliance | Target100% | Measured byCertificate register | ReportedMonthly |
| Critical asset availability | Target≥ 99.5% | Measured byDowntime records | ReportedMonthly |
| First-time fix rate | Target≥ 85% | Measured byCAFM close-out | ReportedMonthly |
Risk management
Principal operational risks for this service and the controls applied on every contract.
| Risk | Control |
|---|---|
| Expired statutory certification | ControlCompliance register with 60-day expiry alerts |
| Legionella | ControlWater safety plan, monitoring and remedial action tracking |
| Critical plant failure | ControlCriticality-ranked PPM and spares holding for critical assets |
| Unsafe isolation | ControlPermit-to-work, lock-out/tag-out, competent persons register |
Reporting
- PPM completion and backlog
- Statutory certificate register
- Asset condition and remedial works
- Lifecycle forecast (annual)
| Cadence | Output |
|---|---|
| Daily | OutputTask completion and attendance, available in the client portal |
| Weekly | OutputExceptions, reactive requests and open actions |
| Monthly | OutputKPI performance report, audit results, HSE statistics, corrective actions |
| Quarterly | OutputContract review: trends, innovation proposals, cost and consumption |
| Annually | OutputContract performance review, ESG data and specification refresh |
Mobilisation
Every contract follows the same dated mobilisation plan, closed out with a report at Day 90.
Weeks −6 to −4
Contract award & due diligence
- Mobilisation lead and contract manager appointed
- TUPE / incumbent workforce data requested and reviewed
- Site surveys and asset verification
Weeks −4 to −2
Specification & systems
- Task schedules and frequencies agreed per area
- Risk assessments, method statements and COSHH register issued
- CAFM, helpdesk and reporting configured to the KPI schedule
Weeks −2 to 0
People & equipment
- Vetting, induction and site-specific training completed
- Equipment, consumables and uniforms delivered and inspected
- Client stakeholder and escalation matrix confirmed
Day 1 to Day 90
Service commencement & stabilisation
- Daily supervisor walk-rounds and weekly client reviews
- Baseline audits completed in the first 30 days
- Mobilisation close-out report issued at Day 90
Additional for this service
- Asset register verification and criticality ranking
- Transfer of statutory certificates and logbooks
Contract evidence
Procurement questions
Do you verify the asset register?
Yes. We survey and tag assets in the first 60 days and report discrepancies before PPM pricing is finalised.
Who holds the certificates?
Certificates are stored in CAFM and remain the client's records. They transfer with the contract.
Included in every contract
- Named contract manager
- 24/7 service desk
- Independent quality audits
- Monthly KPI report
- Site-specific risk assessments
- Vetted, trained personnel
Request a proposal for planned preventive maintenance.
Share your sites, scope and timelines. We will arrange a site survey and return a specification, staffing model and price.