Maintenance
Reactive Maintenance
SLA-driven call-outs with 24/7 dispatch and first-time fix targets.
- Specified tasks
- 4
- Contracted KPIs
- 4
- Risk controls
- 3
- Reporting
- Monthly
Overview
Reactive maintenance is delivered through a 24/7 helpdesk that logs, prioritises and dispatches every request against agreed response and rectification times.
Mobile engineers carry stock for common repairs, and every job is closed out with notes and photographs visible to the client.
Scope of service
Typical inclusions. Final scope is confirmed in the service specification after site survey.
Response
- 24/7 helpdesk and dispatch
- Mobile multi-skilled engineers
- Out-of-hours emergency cover
- Make-safe and temporary repairs
Trades
- Electrical
- Plumbing and drainage
- HVAC
- Carpentry, glazing and locks
Specification
Extract from a standard specification. Frequencies and standards are set per area and risk rating for each contract.
| Task | Frequency | Standard |
|---|---|---|
| P1 — Emergency (safety, security, business-critical) | FrequencyOn demand | StandardAttend ≤ 2 hours, make safe ≤ 4 hours |
| P2 — Urgent | FrequencyOn demand | StandardAttend ≤ 4 hours, fix ≤ 24 hours |
| P3 — Routine | FrequencyOn demand | StandardAttend ≤ 24 hours, fix ≤ 5 days |
| P4 — Planned | FrequencyScheduled | StandardFix ≤ 20 working days |
Performance & KPIs
Default targets. Contracted KPIs, measurement methods and any service credits are agreed before mobilisation.
| KPI | Target | Measured by | Reported |
|---|---|---|---|
| P1 attendance within SLA | Target≥ 98% | Measured byCAFM timestamps | ReportedMonthly |
| Rectification within SLA | Target≥ 95% | Measured byCAFM close-out | ReportedMonthly |
| First-time fix rate | Target≥ 85% | Measured byCAFM close-out | ReportedMonthly |
| Repeat calls within 30 days | Target≤ 5% | Measured byCAFM asset history | ReportedMonthly |
Risk management
Principal operational risks for this service and the controls applied on every contract.
| Risk | Control |
|---|---|
| Delayed response to safety-critical faults | ControlPriority matrix, on-call rota and escalation after 30 minutes |
| Recurring faults | ControlRepeat-call analysis feeding PPM and lifecycle planning |
| Uncontrolled spend | ControlPre-agreed schedule of rates and approval thresholds |
Reporting
- SLA performance by priority
- Open and overdue jobs
- Repeat-fault analysis
- Spend against schedule of rates
| Cadence | Output |
|---|---|
| Daily | OutputTask completion and attendance, available in the client portal |
| Weekly | OutputExceptions, reactive requests and open actions |
| Monthly | OutputKPI performance report, audit results, HSE statistics, corrective actions |
| Quarterly | OutputContract review: trends, innovation proposals, cost and consumption |
| Annually | OutputContract performance review, ESG data and specification refresh |
Mobilisation
Every contract follows the same dated mobilisation plan, closed out with a report at Day 90.
Weeks −6 to −4
Contract award & due diligence
- Mobilisation lead and contract manager appointed
- TUPE / incumbent workforce data requested and reviewed
- Site surveys and asset verification
Weeks −4 to −2
Specification & systems
- Task schedules and frequencies agreed per area
- Risk assessments, method statements and COSHH register issued
- CAFM, helpdesk and reporting configured to the KPI schedule
Weeks −2 to 0
People & equipment
- Vetting, induction and site-specific training completed
- Equipment, consumables and uniforms delivered and inspected
- Client stakeholder and escalation matrix confirmed
Day 1 to Day 90
Service commencement & stabilisation
- Daily supervisor walk-rounds and weekly client reviews
- Baseline audits completed in the first 30 days
- Mobilisation close-out report issued at Day 90
Additional for this service
- Priority matrix agreed per site
- Helpdesk numbers and escalation matrix issued before Day 1
Contract evidence
Procurement questions
How are priorities set?
A priority matrix is agreed per site at mobilisation. The helpdesk applies it on logging and the client can escalate any job.
How are costs controlled?
Work above an agreed threshold requires client approval. All work is priced against a schedule of rates.
Included in every contract
- Named contract manager
- 24/7 service desk
- Independent quality audits
- Monthly KPI report
- Site-specific risk assessments
- Vetted, trained personnel
Request a proposal for reactive maintenance.
Share your sites, scope and timelines. We will arrange a site survey and return a specification, staffing model and price.